Document Type : Research

Authors

1 PhD student in Geography and Urban Planning, Department of Urban Planning, Faculty of Art and Architecture, Mashhad Branch, Islamic Azad University, Mashhad, Iran

2 Associate Professor,Department of Urban Planning, Mashhad Branch, Islamic Azad University, Mashhad, Iran

3 Associate Professor, Department of Urban Planning, Mashhad Branch, Islamic Azad University, Mashhad, Iran

4 Associate Professor, Department of Urban Planning, Iran University of Science and Technology,Tehran, Iran

5 Assistant Professor, Department of Urban Planning, Mashhad Branch, Islamic Azad University, Mashhad, Iran

Abstract

The presence of actors in the field of urban planning and the lack of attention paid to optimal land use planning potentially provoke conflict between actors and thwart land use plans. In Iran, planning system and urban development plans have major drawbacks in terms of recognizing the interests of various actors, and their conflicts of interests, giving direction and managing the above interests in developing land use planning.  The main purpose of this article is to present a conceptual model of conflict management of actors in the process of urban land use planning. This is qualitative research that uses both meta-analysis and grounded theory for data analysis. Data coding was conducted by Nvivo software. The data collection instrument involved document analysis and semi-structured interviews. Based on the questions raised in the interviews, 467 references were provided. After multiple reviews and merging codes based on similarity during several stages of data summarization, 40 initial codes were extracted. According to the research results and informed by the analysis of texts and theoretical foundations and the adoption of the meta-synthesis method, first, an initial conceptual model of the conflict of interests of urban actors in the land use planning process was developed that consisted of 6 components: value conflict, economic conflict, procedural conflict (inter-organizational synergy), conflict of public and private interests, non-participation, and organizational conflict. Then, the aforementioned components were incorporated in the process of drafting interview questions and applying the data-driven method, and the components of the final model of the conflict of interests of urban actors were presented, consisting of 6 components of the initial model and 18 related sub-components.

Keywords

Main Subjects

  1. احمدپور، ا؛ حاتمی‌نژاد، ح؛ کرامت‌الله زیاری، ح.ع؛ و فرجی‌سبکبار، ا. (1393). بررسی و ارزیابی کاربری اراضی شهری از منظر عدالت اجتماعی (مورد مطالعه: کاشان). آمایش سرزمین، 6(2)، 179-208. http://ensani.ir/file/download/article/20150714133249-9443-44.pdf
  2. دینکرلی، هارولد .ب (1376). سیاست زمین‌شهری. (ع. کوثری، مترجم). تهران: انتشارات سازمان ملی زمین و مسکن.
  3. رفیعیان، م؛ و معروفی، س. (1390). نقش و کاربرد رویکرد برنامه‌ریزی ارتباطی در نظریه‌های نوین شهرسازی. معماری و شهرسازی آرمان شهر، 4(7)، 113-120.
  4. رهنما، م.ر. (1387). اثرات اجرای طرح‌های بهسازی و نوسازی مرکز شهر مشهد بر محله پایین خیابان. جغرافیا و توسعه، 6(11)،157-180.
  5. زنگی‌آبادی، ع؛ و زنگنه، م. (1393). شهروندی مشارکتی و نقش آن در بهینه‌سازی مدیریت شهری، مطالعه موردی منطقه 1 شهر مشهد. پژوهش‌های جغرافیایی برنامه‌ریزی شهری، 2(2)،219-238.
  6. سرخیلی، ا؛ رفیعیان، م؛ و تقوایی، ع.ا. (1395). بررسی الگوی مدیریت تعارض ذی‌نفعان و ذی‌نفوذان در ابرپروژه‌های شهر مشهد. جغرافیا و توسعه، شماره 45، 141-158

https://gdij.usb.ac.ir/article_2926_458571ad4d03c3f3e344632cae4386b8.pdf

  1. شریف‌زادگان، م.ح؛ و شفیعی، ا. (1393). برنامه‌ریزی ارتباطی به‌عنوان رویکرد پیشنهادی برای برنامه‌ریزی شهری در مقیاس محلّات در محلّه فرحزاد شهر تهران. فصلنامة علمی پژوهشی رفاه اجتماعی 15(56)، 281-313.
  2. صرافی، م؛ توکلی‌نیا، ج؛ و چمنی‌مقدم، م. (1394). جایگاه برنامه‌ریز در فرآیند برنامه‌ریزی شهری ایران. فصلنامه علمی پژوهشی مطالعات شهری، 3(12)، 19-32.

http://urbstudies.uok.ac.ir/article_10945_4bc4962f4cf8051b2db8d461303d7fe5.pdf

  1. عزیزی، م.م؛ ابویى‌اردکان، م؛ و نورى، ن. (1391). بررسى نقش کنشگران و ابزارهای مدیریت شهری در یکپارچگى مدیریت کلان‌شهر تهران. مجله علمی‌-پژوهشی هویت شهر، 10(6)، 5-16.

https://hoviatshahr.srbiau.ac.ir/article_1321_49086c11b2ee002eb0d3e08e0d 2d5a27.pdf

  1. عزیزی، م.م؛ وآراسته، م. (1390). تبیین پراکنده‌رویی شهری براساس شاخص تراکم ساختمانی (مطالعه موردی شهر یزد). هویت شهر، 5(8)، 5-15.
  2. فیروزنیا، ق؛ و قرنی‌آرانی، ب. (1394).به‌کارگیری تحلیل بازیگران در فرایند ساماندهی نظام مدیریت و برنامه‌ریزی توسعة روستایی. فصلنامه علمی پژوهشی پژوهش‌های روستایی، 4(6)،895- 915. 22059/jrur.2015.57365
  3. کاظمیان، غ.ر؛ و جلیلی، م. (1394). تحلیل قدرت ذی‌نفعان کلیدی در فرآیند سیاست‌گذاری طرح جامع تهران. نشریه‌نامه معماری و شهرسازی، 8(15)، 139-157.
  4. گادز چاک، د؛ کایسر، ا؛ و چپین، ا. (1395). برنامه‌ریزی کاربری زمین. (م. طبیبیان، مترجم). تهران: موسسه چاپ و انتشارات دانشگاه تهران.

گل‌دار، ز؛ امیری، م؛ قلی‌پورسوته، ر.ا؛ و معظمی، م. (1396). طراحی چارچوب مفهومی درگیرسازی ذی‌نفعان در خط‌مشی‌گذاری عمومی. دانش حسابرسی، 17(66)، 81-105. file:///C:/Users/F1/AppData/Local/Temp/4026013966604.pdf

  1. گلزاری‌اسکوئی، ن؛ و هودسی، ه. ( 1394). مدیریت تعارض کنشگران در فرآیند تهیه و اجرای برنامه‌های توسعۀ شهری. مرکز مطالعات و برنامه‌ریزی شهری تهران، گزارش شماره 329.

https://www.noandishaan.com/uploads/do.php?id=3327

  1. لاریجانی، م؛ قربانی، م؛ و رحمانی‌آزاد، ا. (1392). تحلیل شبکۀ ذی‌نفعان محلی و کنشگران کلیدی (شبکه قدرت) در مدیریت مشارکت سرزمینی (منطقه مورد مطالعه: بهره برداران مرتع روستای لزور). پژوهش‌های دانش سرزمین، 4(1)، 37-50.

https://esrj.sbu.ac.ir/article_94996_2612cd5b89a4ec146277eefdada33d82.pdf

  1. مجیدی‌خامنه، ب؛ جنگی، ح؛ و ضرغامی، س. (1394). سنجش رضایت مردم از خدمات رفاه عمومی در نظام کاربری اراضی شهری (مطالعه موردی: مناطق 14،15،16 شهرداری تهران). مجله پژوهش و برنامه‌ریزی شهری، 6(20)، 121-138.

http://journals.miau.ac.ir/article_823_ff23f843332c6756a02c4cb052c5517b.pdf

  1. مشهودی، س. (1386). مبانی طرح‌های سیال شهری. شرکت پردازش و برنامه‌ریزی شهری، چاپ دوم. تهران: شرکت پردازش و برنامه‌ریزی شهری.‌
  2. نوریان، ف؛ و خاکپور، ا. (1395). ارائه مدلی جهت شناسایی بهره‌وران کلیدی در برنامه‌های شهری، نمونه موردی: ناحیۀ جوادیه منطقه 16 شهرداری تهران. معماری و شهرسازی آرمانشهر، 10(19)، 271-281.

http://www.armanshahrjournal.com/article_50507_27c82daf0faefff0802d80298941693b.pdf?lang=en

  1. وحیدی‌برجی، گ؛ نوریان، ف؛ و عزیزی، م.م. (1396). شناسایی علل عدم تحقق کاربری‌های پیشنهادی در طرح‌های توسعه شهری ایران با استفاده از نظریۀ زمینه‌ای. نشریۀ هنرهای زیبا معماری و شهرسازی، 22(1)، 5-14.
  2. A Guide to the Project Management Body of Knowledge (PMBOK Guide), Project Management Institute (PMI), (2013) 400-410. http://www.cs.bilkent.edu.tr/~cagatay/cs413/PMBOK.p
  3. Aapaoja, A., Haapasalo, H., & Söderström, P. (2013). Early Stakeholder Involvement in the Project Definition Phase: Case Renovation, Hindawi Publishing Corporation ISRN Industrial Engineering Volume 2013, 1-14
  4. Braimoh, K. L., & Onishi, T. (2007). Spatial Determinants of Urban Land Use Change in Lagos, Nigeria. Land Use Policy, 24, 502-515.
  5. B., Coleman. P., & Putnam. L. (2007). Introduction: Intractable conflict: New perspectives on the causes and conditions for change. American Behavioral Scientist, 50(11), 1415–1429.

https://doi.org/10.1177/0002764207302459

  1. Geist, H. J., & Lambin, E. F. (2002). Proximate causes and underlying driving forces of tropical deforestation. BioScience 52(2), 143-150. org/10.1641/0006-3568 (2002)052[0143: PCAUDF] 2.0.CO; 2
  2. Y., Wang. J., Zhang.M., & Li. S. (2021). Measurement and prediction of land use conflict in an opencast mining area. Resources Policy, Volume 71, 101999, doi.org/10.1016/j.resourpol.2021.101999
  3. Y. R (2014). an investigation of stakeholder analysis in urban development projects: Empirical or rationalistic perspectives. International Journal of Project Management, Volume 32, Issue 5, 838-849.

 doi.org/10.1016/j.ijproman.2013.10.011

  1. Jones, G. (2008). Contemporary Management. New York: McGraw -Hill Company.
  2. A., & Brown. G. (2017). Assessing multiple approaches for modelling land-use conflict potential from participatory mapping data, Land Use Policy, V. 67, 253-267. doi.org/10.1016/j.landusepol.2017.06.004
  3. J. (2021). Sustain (able) urban (eco) systems: Stakeholder-related success factors in urban innovation projects. Technological Forecasting and Social Change, Volume 168, 120767. doi.org/10.1016/j.techfore.2021.120767
  4. Lewis, D. A. (2015). Identifying and Avoiding Conflicts between Historic Preservation and the Development of Renewable Energy. IUCN. https://www.nyuelj.org/wp-content/uploads/2015/02/Lewis_READY_FOR_WEBSITE.pdf
  5. O. (2016). Conflict Management, a New Challenge. Procedia Economics and Finance Volume 39, 807-814. doi.org/10.1016/S2212-5671 (16)30255-6
  6. Madani, K. (2010). Game theory and water resources. Journal of Hydrology, 381, No. 3- 4, 225-238.
  7. Madani, K., & Hipel, K. W. (2011). Non-cooperative stability definitions for strategic analysis of generic water resources conflicts. Water Resource Manage 25, 1949–1977.
  8. H. (2013).  Land use conflicts in developing countries: framing conflict resolution and prevention strategies to ensure economic growth and human welfare. The case of Chotiari water reservoir from Pakistan. https://pastel.archives-ouvertes.fr/pastel-00949960
  9. Magsi, H., & Torre, A. (2014). Approaches to understand land use conflicts in the developing countries. The Macrotheme Review, Volume 2, Issue 1, 119-136.
  10. MASORE, F. M. (2011). Analysis of land use conflict in Zanzibar: A participatory approach. Master of Science Thesis in Geo-information Science and Earth Observation., Faculty of Geo-Information Science and Earth Observation of the University of Twente. https://filetransfer.itc.nl/pub/pgis/Zanzibar/2011-UPM FLAVIAN%20MUHULA%20MASORE-24110.pdf
  11. Mohamed, M., & Ventura, S. (2000). Use of geomatics for mapping and documenting indigenous tenure systems. Society and Natural Resources, 13(3), 223-236. org/10.1080/089419200279072
  12. Pacione, M. (2013). Private profit, public interest and land use planning, A conflict interpretation of residential development pressure in Glasgow's rural–urban fringe, Land Use Policy,61-77. DOI:10.1016/j.landusepol.2012.09.013
  13. Peltonen, L., & Sairinen, R. (2010). Integrating Impact Assessment and Conflict Management in Urban Planning: Experiences from Finland. Environmental Impact Assessment Review, 30, 328-337.
  14. Pikkat , A. (2005). Conflict Management within the NSW Planning System: Resolving land use conflicts associated with major developments in urban areas؛ Resolving land use conflicts associated with major developments in urban areas. An Undergraduate Thesis ,The University of New South Wales , Faculty of the Built Environment Planning and Urban Development Program
  15. I.S., Fontes O. L., & Vidal. V. J. G. (2021). urban consolidation centers: Impact analysis by stakeholder. Research in Transportation Economics, Available online 27.101045, doi.org/10.1016/j.retrec.2021.101045
  16. Tait, M. (2015). Trust and the Public Interest in the Micropolitics of Planning Practice, June 2011. Journal of Planning Education and Research 31(2),157-171. DOI:1177/0739456X11402628
  17. T., Liang. X., Shen G. Q., Shi. Q., & Wang. G. (2019). An optimization model for managing stakeholder conflicts in urban redevelopment projects in China. Journal of Cleaner Production, Volume 212, 537-547. doi.org/10.1016/j.jclepro.2018.12.071

 

  1. T., Qian Q. K., Visscher.H., Elsinga.M. G., & Wu. W. (2019). The role of stakeholders and their participation network in decision-making of urban renewal in China: The case of Chongqing. Cities, Volume 92, 47-58. doi.org/10.1016/j.cities.2019.03.014
  2. L., Liu.Y., Wang.J., & Yang. Y. (2021). an analysis of land use conflict potentials based on ecological-production-living function in the southeast coastal area of China. Ecological Indicators, Volume 122, 107297. doi.org/10.1016/j.ecolind.2020.107297
CAPTCHA Image